𝔖 Scriptorium
✦   LIBER   ✦

πŸ“

Scheduling of Resource-Constrained Projects

✍ Scribed by Robert Klein (auth.)


Publisher
Springer US
Year
2000
Tongue
English
Leaves
378
Series
Operations Research/Computer Science Interfaces Series 10
Edition
1
Category
Library

⬇  Acquire This Volume

No coin nor oath required. For personal study only.

✦ Synopsis


Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practitioners as well as scientists working in the field of project management.
The book is divided into two parts. In Part I, the project management process is described and the management tasks to be accomplished during project planning and control are discussed. This allows for identifying the major scheduling problems arising in the planning process, among which the resource-constrained project scheduling problem is the most important. Part II deals with efficient computer-based procedures for the resource-constrained project scheduling problem and its generalized version. Since both problems are NP-hard, the development of such procedures which yield satisfactory solutions in a reasonable amount of computation time is very challenging, and a number of new and very promising approaches are introduced. This includes heuristic procedures based on priority rules and tabu search as well as lower bound methods and branch and bound procedures which can be applied for computing optimal solutions.

✦ Table of Contents


Front Matter....Pages I-XVI
Front Matter....Pages XVII-XVII
The Project Management Process....Pages 1-31
Project Planning and Control....Pages 33-71
Resource-Constrained Scheduling Problems....Pages 73-109
Front Matter....Pages 111-111
Lower Bound Methods....Pages 113-160
Heuristic Procedures....Pages 161-211
Exact Procedures....Pages 213-259
Computational Experiments....Pages 261-324
Summary and Conclusions....Pages 325-331
Back Matter....Pages 333-369

✦ Subjects


Operations Research, Management Science; Optimization; Production/Logistics/Supply Chain Management


πŸ“œ SIMILAR VOLUMES


Resource-constrained Project Scheduling
✍ Christian Artigues, Sophie Demassey, Emmanuel NΓ©ron πŸ“‚ Library πŸ“… 2008 πŸ› Wiley-ISTE 🌐 English

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the st

Resource-Constrained Project Scheduling:
✍ Francis Sourd(eds.) πŸ“‚ Library πŸ“… 2008 πŸ› Wiley-ISTE 🌐 English

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.<br> In the first part, the st

Resource-Constrained Project Scheduling:
✍ Christian Artigues, Sophie Demassey, Emmanuel NΓ©ron πŸ“‚ Library πŸ“… 2008 πŸ› Wiley-ISTE 🌐 English

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.<br>In the first part, the sta

Project Scheduling with Time Windows and
✍ Klaus Neumann, Christoph Schwindt, JΓΌrgen Zimmermann πŸ“‚ Library πŸ“… 2003 πŸ› Springer 🌐 English

A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice -

Project Scheduling with Time Windows and
✍ Prof. Dr. Klaus Neumann, Dr. Christoph Schwindt, Dr. JΓΌrgen Zimmermann (auth.) πŸ“‚ Library πŸ“… 2002 πŸ› Springer Berlin Heidelberg 🌐 English

The monograph deals with deterministic project scheduling with time windows for activities and with limited resources. In addition to project duration or makespan, a large number of mostly nonregular objective functions are considered, for example, net present value, earliness plus tardiness cost, c

Project Scheduling with Time Windows and
✍ Professor Dr. Klaus Neumann, Dr. Christoph Schwindt, Professor Dr. JΓΌrgen Zimmer πŸ“‚ Library πŸ“… 2003 πŸ› Springer-Verlag Berlin Heidelberg 🌐 English

<p><P>From the reviews of the second edition:</P><P></P><P>"The book deals with so-called temporal project scheduling with schedule-dependent time windows. … Overall, the book has produced a fairly comprehensive and well-organized treatment of these topics. … the authors have done a terrific job of