๐”– Scriptorium
โœฆ   LIBER   โœฆ

๐Ÿ“

Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions

โœ Scribed by Professor Dr. Klaus Neumann, Dr. Christoph Schwindt, Professor Dr. Jรผrgen Zimmermann (auth.)


Publisher
Springer-Verlag Berlin Heidelberg
Year
2003
Tongue
English
Leaves
393
Edition
2
Category
Library

โฌ‡  Acquire This Volume

No coin nor oath required. For personal study only.

โœฆ Synopsis


From the reviews of the second edition:

"The book deals with so-called temporal project scheduling with schedule-dependent time windows. โ€ฆ Overall, the book has produced a fairly comprehensive and well-organized treatment of these topics. โ€ฆ the authors have done a terrific job of binding themโ€“including many of their own contributionsโ€“together in a coherent way. โ€ฆ Their well- grounded choices make the technical details easier to follow. โ€ฆ As such, the book represents a noteworthy addition to project-scheduling reference list for both academicians and practitioners alike." (J Xue, Journal of the Operational Research Society, Vol. 56, 2005)

"The book presents a state of the art in the sub-field of scheduling theory, i.e. the project scheduling under scarce resources written by well known experts in the field. Although several books have been recently published in that area, one can observe a number of features which distinguish this book from the others. โ€ฆ The book is thoroughly written and the mathematics used is adequate to the needs. It contains also many algorithms described in pseudo-code. Several examples complement nicely their presentation." (Jacek Blazewicz, Zentralblatt MATH, Vol. 1059 (10), 2005)

"The book presents the state of the art of deterministic resource-constrained project scheduling with time windows. โ€ฆ A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed." (GfPMagazin โ€“ online, April, 2005)

"At last a professional book dealing with the exact formulation of project scheduling. When I obtained it I first couldnโ€™t believe that there is really a book with definitions, propositions, proofs, lemmas and theorems about how to schedule activities with the metra potential method. Fortunately, there are also a lot of examples and concrete algorithms that describe simple scheduling tasks as well as schedule-improvement procedures. โ€ฆ The book is truly scientific, you find e.g. a comprehensive list of references of more than 200 scientific publications." (Dr. Georg Angermeier, www.projektmagazin.de, August, 2004)

โœฆ Table of Contents


Front Matter....Pages i-xiii
Temporal Project Scheduling....Pages 1-20
Resource-Constrained Project Scheduling โ€” Minimization of Project Duration....Pages 21-194
Resource-Constrained Project Scheduling โ€” Minimization of General Objective Functions....Pages 195-346
Back Matter....Pages 347-385

โœฆ Subjects


Software Engineering/Programming and Operating Systems; Operation Research/Decision Theory; Production/Logistics/Supply Chain Management


๐Ÿ“œ SIMILAR VOLUMES


Project Scheduling with Time Windows and
โœ Klaus Neumann, Christoph Schwindt, Jรผrgen Zimmermann ๐Ÿ“‚ Library ๐Ÿ“… 2003 ๐Ÿ› Springer ๐ŸŒ English

A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice -

Project Scheduling with Time Windows and
โœ Prof. Dr. Klaus Neumann, Dr. Christoph Schwindt, Dr. Jรผrgen Zimmermann (auth.) ๐Ÿ“‚ Library ๐Ÿ“… 2002 ๐Ÿ› Springer Berlin Heidelberg ๐ŸŒ English

The monograph deals with deterministic project scheduling with time windows for activities and with limited resources. In addition to project duration or makespan, a large number of mostly nonregular objective functions are considered, for example, net present value, earliness plus tardiness cost, c

Resource-constrained Project Scheduling
โœ Christian Artigues, Sophie Demassey, Emmanuel Nรฉron ๐Ÿ“‚ Library ๐Ÿ“… 2008 ๐Ÿ› Wiley-ISTE ๐ŸŒ English

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the st

Scheduling of Resource-Constrained Proje
โœ Robert Klein (auth.) ๐Ÿ“‚ Library ๐Ÿ“… 2000 ๐Ÿ› Springer US ๐ŸŒ English

<p>Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of

Resource-Constrained Project Scheduling:
โœ Francis Sourd(eds.) ๐Ÿ“‚ Library ๐Ÿ“… 2008 ๐Ÿ› Wiley-ISTE ๐ŸŒ English

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.<br> In the first part, the st

Resource-Constrained Project Scheduling:
โœ Christian Artigues, Sophie Demassey, Emmanuel Nรฉron ๐Ÿ“‚ Library ๐Ÿ“… 2008 ๐Ÿ› Wiley-ISTE ๐ŸŒ English

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.<br>In the first part, the sta