𝔖 Scriptorium
✦   LIBER   ✦

πŸ“

Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications

✍ Scribed by Christian Artigues, Sophie Demassey, Emmanuel Néron


Publisher
Wiley-ISTE
Year
2008
Tongue
English
Leaves
292
Series
ISTE
Edition
1
Category
Library

⬇  Acquire This Volume

No coin nor oath required. For personal study only.

✦ Synopsis


This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.
In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided.
The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations.
The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.


πŸ“œ SIMILAR VOLUMES


Resource-Constrained Project Scheduling:
✍ Francis Sourd(eds.) πŸ“‚ Library πŸ“… 2008 πŸ› Wiley-ISTE 🌐 English

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.<br> In the first part, the st

Project Scheduling: Recent Models, Algor
✍ Willy Herroelen, Erik Demeulemeester, Bert De Reyck (auth.), Jan WΔ™glarz (eds.) πŸ“‚ Library πŸ“… 1999 πŸ› Springer US 🌐 English

<p>Project scheduling problems are, generally speaking, the problems of allocating scarce resources over time to perform a given set of activities. The resources are nothing other than the arbitrary means which activities complete for. Also the activities can have a variety of interpretations. Thus,

Resource-constrained Project Scheduling
✍ Christian Artigues, Sophie Demassey, Emmanuel NΓ©ron πŸ“‚ Library πŸ“… 2008 πŸ› Wiley-ISTE 🌐 English

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the st

Project Scheduling under Limited Resourc
✍ Dr. SΓΆnke Hartmann (auth.) πŸ“‚ Library πŸ“… 1999 πŸ› Springer-Verlag Berlin Heidelberg 🌐 English

<p>Approaches to project scheduling under resource constraints are discussed in this book. After an overview of different models, it deals with exact and heuristic scheduling algorithms. The focus is on the development of new algorithms. Computational experiments demonstrate the efficiency of the ne

Scheduling of Resource-Constrained Proje
✍ Robert Klein (auth.) πŸ“‚ Library πŸ“… 2000 πŸ› Springer US 🌐 English

<p>Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of

Resource-Constrained Project Scheduling:
✍ Dr. Arno Sprecher (auth.) πŸ“‚ Library πŸ“… 1994 πŸ› Springer-Verlag Berlin Heidelberg 🌐 English

<p>Within a project human and non-human resources are pulled together in a tempoΒ­ raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the sc