✦ Synopsis


A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed in the second edition.


πŸ“œ SIMILAR VOLUMES


Project Scheduling with Time Windows and
✍ Prof. Dr. Klaus Neumann, Dr. Christoph Schwindt, Dr. JΓΌrgen Zimmermann (auth.) πŸ“‚ Library πŸ“… 2002 πŸ› Springer Berlin Heidelberg 🌐 English

The monograph deals with deterministic project scheduling with time windows for activities and with limited resources. In addition to project duration or makespan, a large number of mostly nonregular objective functions are considered, for example, net present value, earliness plus tardiness cost, c

Project Scheduling with Time Windows and
✍ Professor Dr. Klaus Neumann, Dr. Christoph Schwindt, Professor Dr. JΓΌrgen Zimmer πŸ“‚ Library πŸ“… 2003 πŸ› Springer-Verlag Berlin Heidelberg 🌐 English

<p><P>From the reviews of the second edition:</P><P></P><P>"The book deals with so-called temporal project scheduling with schedule-dependent time windows. … Overall, the book has produced a fairly comprehensive and well-organized treatment of these topics. … the authors have done a terrific job of

Resource-constrained Project Scheduling
✍ Christian Artigues, Sophie Demassey, Emmanuel NΓ©ron πŸ“‚ Library πŸ“… 2008 πŸ› Wiley-ISTE 🌐 English

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the st

Scheduling of Resource-Constrained Proje
✍ Robert Klein (auth.) πŸ“‚ Library πŸ“… 2000 πŸ› Springer US 🌐 English

<p>Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of

Resource-Constrained Project Scheduling:
✍ Francis Sourd(eds.) πŸ“‚ Library πŸ“… 2008 πŸ› Wiley-ISTE 🌐 English

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.<br> In the first part, the st

Resource-Constrained Project Scheduling:
✍ Christian Artigues, Sophie Demassey, Emmanuel NΓ©ron πŸ“‚ Library πŸ“… 2008 πŸ› Wiley-ISTE 🌐 English