The two-machine flowshop scheduling problem with total tardiness
โ Scribed by Tapan Sen; Parthasarati Dileepan; Jatinder N.D. Gupia
- Publisher
- Elsevier Science
- Year
- 1989
- Tongue
- English
- Weight
- 609 KB
- Volume
- 16
- Category
- Article
- ISSN
- 0305-0548
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
In this paper we consider a practical scheduling problem commonly arising from batch production in a flexible manufacturing environment. Different part-types are to be produced in a flexible manufacturing cell organized into a two-stage production line. The jobs are processed in batches on the first
The paper deals with the solution of the single machine total tardiness model. It improves and generalizes an important rule to decompose the model into two subproblems. It also provides a O(n) procedure to implement this rule and its generalization. Those two rules, along with some known results, a
The paper deals with the single-machine total tardiness problem. It investigates the authors' most recent branch and bound algorithm and discovers the following paradoxes. Deleting a lower bound drastically improves the performance of the algorithm, while adding a stronger component, like a better d