𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness

✍ Scribed by Ali Allahverdi


Publisher
Elsevier Science
Year
1996
Tongue
English
Weight
559 KB
Volume
23
Category
Article
ISSN
0305-0548

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Note: Open-shop scheduling with release
✍ Hans Kellerer; Thomas Tautenhahn; Gerhard Woeginger πŸ“‚ Article πŸ“… 1995 πŸ› John Wiley and Sons 🌐 English βš– 295 KB πŸ‘ 2 views

We present the first polynomial-time algorithm for an open-shop problem with unit execution times, arbitrary release dates, and due dates. The objective is to minimize maximum lateness. 0 I995 John Wiley & Sons. Inc.

Fast algorithms to minimize the makespan
✍ Jinliang Cheng; George Steiner; Paul Stephenson πŸ“‚ Article πŸ“… 2002 πŸ› Springer US 🌐 English βš– 186 KB πŸ‘ 2 views

We consider the two-machine ow-shop problem with release times where the objective is to minimize either the makespan or the maximum lateness. We present a uniΓΏed treatment of various sequenceinterchange operators and derive powerful new dominance orders, which are incorporated into branchand-bound

Single-Machine Scheduling to Minimize a
✍ J.A. Hoogeveen πŸ“‚ Article πŸ“… 1996 πŸ› Elsevier Science 🌐 English βš– 210 KB

We consider the problem of scheduling n jobs on a single machine that is continuously available from time zero onward and that can handle no more than one job at a time. Each job requires processing during a given positive uninter-Ε½ . rupted time. The cost of each job is measured by K Ks2, 3 nondecr