This paper deals with the problem of makespan minimization in a flow shop with two machines when the input buffer of the second machine can only host a limited number of parts. Here we analyze the problem in the context of batch processing, i.e., when identical parts must be processed consecutively.
Makespan minimization in the two-machine flowshop batch scheduling problem
โ Scribed by T.C.E. Cheng; B.M.T. Lin; A. Toker
- Publisher
- John Wiley and Sons
- Year
- 2000
- Tongue
- English
- Weight
- 202 KB
- Volume
- 47
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
โฆ Synopsis
In this paper we consider a practical scheduling problem commonly arising from batch production in a flexible manufacturing environment. Different part-types are to be produced in a flexible manufacturing cell organized into a two-stage production line. The jobs are processed in batches on the first machine, and the completion time of a job is defined as the completion time of the batch containing it. When processing of all jobs in a batch is completed on the first machine, the whole batch of jobs is transferred intact to the second machine. A constant setup time is incurred whenever a batch is formed on any machine. The tradeoff between the setup times and batch processing times gives rise to the batch composition decision. The problem is to find the optimal batch composition and the optimal schedule of the batches so that the makespan is minimized. The problem is shown to be strongly NP-hard. We identify some special cases by introducing their corresponding solution methods. Heuristic algorithms are also proposed to derive approximate solutions. We conduct computational experiments to study the effectiveness of the proposed heuristics.
๐ SIMILAR VOLUMES