Scheduling in a manufacturing shop with sequence-dependent setups

โœ Scribed by Chen Zhou; Pius J. Egbelu


Publisher
Elsevier Science
Year
1989
Tongue
English
Weight
686 KB
Volume
5
Category
Article
ISSN
0736-5845

No coin nor oath required. For personal study only.

โœฆ Synopsis


In this paper, the problem of scheduling multiple jobs in a flexible manufacturing cell with multiple machine stations is addressed. Due to the large capital investments that usually characterize flexible manufacturing systems (FMS), an area of control of great interest to system users is that of maximizing the system performance through the minimization of machine idle and setup times. The magnitude of total time spent on machine setups and idle times is influenced by the availability of jobs, job mix, similarities of jobs and job scheduling procedure used. Similar jobs on the same machine require less setup times. Similarly, the use of an adequate scheduling method also reduces total idle and setup times. Such reduction improves the flow times of jobs. In this paper, a heuristic algorithm for scheduling jobs with sequence dependent setup times in a FMS is presented. The measure of performance for evaluating schedule adequacy is the production makespan.


๐Ÿ“œ SIMILAR VOLUMES


Scheduling flowshops with finite buffers
โœ Bryan A Norman ๐Ÿ“‚ Article ๐Ÿ“… 1999 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 145 KB

In this paper we explore ยฏowshop scheduling problems containing both sequence-dependent setup times and ยฎnite buers. To the best of our knowledge, problems containing both of these complexities have not been addressed previously in the literature. The problem is clearly NP-hard and therefore we only

Scheduling jobs on parallel machines wit
โœ Young Hoon Lee; Michael Pinedo ๐Ÿ“‚ Article ๐Ÿ“… 1997 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 855 KB

Consider a number of jobs to be processed on a number of identical machines in parallel. A job has a processing time, a weight and a due date. If a job is followed by another job, a setup time independent of the machine is incurred. A three phase heuristic is presented for minimizing the sum of the