We consider the problem of scheduling a reentrant #ow shop with sequence-dependent setup times to minimize maximum lateness. We develop a series of decomposition methods (DMs) exploring the importance of components such as subproblem solution method, bottleneck identi"cation and reoptimization metho
โฆ LIBER โฆ
A flow-shop problem with sequence-dependent additive setup times
โ Scribed by Wlodzimierz Szwarc; Jatinder N. D. Gupta
- Publisher
- John Wiley and Sons
- Year
- 1987
- Tongue
- English
- Weight
- 388 KB
- Volume
- 34
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Decomposition methods for reentrant flow
โ
Ebru Demirkol; Reha Uzsoy
๐
Article
๐
2000
๐
Springer US
๐
English
โ 345 KB
An exact algorithm for the batch sequenc
โ
A. Agnetis; F. Rossi; G. Gristina
๐
Article
๐
1998
๐
John Wiley and Sons
๐
English
โ 295 KB
๐ 2 views
This paper deals with the problem of makespan minimization in a flow shop with two machines when the input buffer of the second machine can only host a limited number of parts. Here we analyze the problem in the context of batch processing, i.e., when identical parts must be processed consecutively.