This paper considers single machine scheduling problems with setup times and deteriorating jobs. The setup times are proportional to the length of the already processed jobs, that is, the setup times are past-sequence-dependent (p-s-d). It is assumed that the job processing times are defined by func
Scheduling jobs on parallel machines with sequence-dependent setup times
โ Scribed by Young Hoon Lee; Michael Pinedo
- Publisher
- Elsevier Science
- Year
- 1997
- Tongue
- English
- Weight
- 855 KB
- Volume
- 100
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
โฆ Synopsis
Consider a number of jobs to be processed on a number of identical machines in parallel. A job has a processing time, a weight and a due date. If a job is followed by another job, a setup time independent of the machine is incurred. A three phase heuristic is presented for minimizing the sum of the weighted tardinesses. In the first phase, as a pre-processing procedure, factors or statistics which characterize an instance are computed. The second phase consists of constructing a sequence by a dispatching rule which is controlled through parameters determined by the factors. In the third phase, as a post-processing procedure, a simulated annealing method is applied starting from a seed solution which is the result of the second phase. In the dispatching rule of the second phase there are two parameters of which the values are dependent on the particular problem instance at hand. Through extensive experiments rules are developed for determining the values of the two parameters which make the priority rule work effectively. The performance of the simulated annealing procedure in the third phase is evaluated for various values of the factors.
๐ SIMILAR VOLUMES
For the problem of scheduing identical jobs on a set of uniform parallel machines with random processing times, methods are given for optimizing the expected sum of weighted completion times and the probability of meeting a common due date.
Total absolute deviation of job completion times Total load a b s t r a c t In this paper, we study an unrelated parallel machine scheduling problem with setup time and learning effects simultaneously. The setup time is proportional to the length of the already processed jobs. That is, the setup ti
In this paper we explore ยฏowshop scheduling problems containing both sequence-dependent setup times and ยฎnite buers. To the best of our knowledge, problems containing both of these complexities have not been addressed previously in the literature. The problem is clearly NP-hard and therefore we only