๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

On the connection between a cyclic job shop and a reentrant flow shop scheduling problem

โœ Scribed by George Steiner; Zhihui Xue


Publisher
Springer US
Year
2006
Tongue
English
Weight
234 KB
Volume
9
Category
Article
ISSN
1094-6136

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A simulated annealing algorithm for the
โœ Atabak Elmi; Maghsud Solimanpur; Seyda Topaloglu; Afshin Elmi ๐Ÿ“‚ Article ๐Ÿ“… 2011 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 444 KB

This paper addresses the problem of scheduling parts in job shop cellular manufacturing systems by considering exceptional parts that need to visit machines in different cells and reentrant parts which need to visit some machines more than once in non-consecutive manner. Initially, an integer linear