๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

The connection between the bump number problem and flow-shop scheduling with precedence constraints

โœ Scribed by G. Steiner


Publisher
Elsevier Science
Year
1990
Tongue
English
Weight
361 KB
Volume
20
Category
Article
ISSN
0898-1221

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES