𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Multi-stage simultaneous lot-sizing and scheduling for flow line production

✍ Scribed by Seeanner, Florian; Meyr, Herbert


Book ID
118781648
Publisher
Springer
Year
2012
Tongue
German
Weight
641 KB
Volume
35
Category
Article
ISSN
0171-6468

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


A compact heuristic for common cycle lot
✍ M.K. El-Najdawi πŸ“‚ Article πŸ“… 1992 πŸ› Elsevier Science 🌐 English βš– 1018 KB

Common Cycle Scheduling Problem (CCSP) is concerned with determining production lot sizes for a given set of products using a common facility. It is based on scheduling all products using a common (base) cycle time, so that the lot size for each product is the forecasted demand for that product over

LOT-SIZING IN CAPACITATED MULTI-STAGE SE
✍ VINÍCIUS A. ARMENTANO; REGINA ESTHER BERRETTA; PAULO M. FRANCA πŸ“‚ Article πŸ“… 2009 πŸ› Production and Operations Management Society 🌐 English βš– 358 KB