๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processes

โœ Scribed by M.K. El-Najdawi


Publisher
Elsevier Science
Year
1994
Tongue
English
Weight
882 KB
Volume
75
Category
Article
ISSN
0377-2217

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A compact heuristic for common cycle lot
โœ M.K. El-Najdawi ๐Ÿ“‚ Article ๐Ÿ“… 1992 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 1018 KB

Common Cycle Scheduling Problem (CCSP) is concerned with determining production lot sizes for a given set of products using a common facility. It is based on scheduling all products using a common (base) cycle time, so that the lot size for each product is the forecasted demand for that product over