๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A compact heuristic for common cycle lot-size scheduling in multi-stage, multi-product production processes

โœ Scribed by M.K. El-Najdawi


Publisher
Elsevier Science
Year
1992
Tongue
English
Weight
1018 KB
Volume
27
Category
Article
ISSN
0925-5273

No coin nor oath required. For personal study only.

โœฆ Synopsis


Common Cycle Scheduling Problem (CCSP) is concerned with determining production lot sizes for a given set of products using a common facility. It is based on scheduling all products using a common (base) cycle time, so that the lot size for each product is the forecasted demand for that product over the base cycle time.

After reviewing the literature, this paper provides an efficient heuristic solution for the CCSP in a multi-stage, multiproduct, flow shop environment, generalizing earlier results, as well as the single-product results of Szendrovits ( 1975). The framework presented determines a jointly common cycle time and production schedule (start and finish times for each product's production lot size) for the multi-stage facility in question.


๐Ÿ“œ SIMILAR VOLUMES