In this paper we consider a practical scheduling problem commonly arising from batch production in a flexible manufacturing environment. Different part-types are to be produced in a flexible manufacturing cell organized into a two-stage production line. The jobs are processed in batches on the first
โฆ LIBER โฆ
Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint
โ Scribed by Chung-Yee Lee
- Book ID
- 108410514
- Publisher
- Elsevier Science
- Year
- 1997
- Tongue
- English
- Weight
- 712 KB
- Volume
- 20
- Category
- Article
- ISSN
- 0167-6377
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Makespan minimization in the two-machine
โ
T.C.E. Cheng; B.M.T. Lin; A. Toker
๐
Article
๐
2000
๐
John Wiley and Sons
๐
English
โ 202 KB
๐ 2 views
Minimizing Makespan in Semiresumable Cas
โ
Ma Ying; Yang Shan-lin; Chu Cheng-bin
๐
Article
๐
2009
๐
Elsevier
โ 198 KB
An improved heuristic for two-machine fl
โ
T.C.Edwin Cheng; Guoqing Wang
๐
Article
๐
2000
๐
Elsevier Science
๐
English
โ 220 KB
Makespan minimization for two parallel m
โ
Dehua Xu; Zhenmin Cheng; Yunqiang Yin; Hongxing Li
๐
Article
๐
2009
๐
Elsevier Science
๐
English
โ 223 KB
Heuristics for two-machine no-wait flows
โ
Guoqing Wang; T.C.Edwin Cheng
๐
Article
๐
2001
๐
Elsevier Science
๐
English
โ 75 KB
In this paper we study the two-machine no-wait flowshop problem with an availability constraint. The problem has been shown to be NP-hard, and some heuristics with a worst-case error bound of 2 have been developed for it. We provide two improved heuristics for the problem, and show that each has a w
Minimizing makespan in a two-machine flo
โ
Lixin Tang; Peng Liu
๐
Article
๐
2009
๐
Elsevier Science
๐
English
โ 721 KB