The scheduling problem with deteriorating jobs to minimize the makespan on a single machine where the facility has an availability constraint is studied in this paper. By a deteriorating job we mean that the processing time for the job is a function of its starting time. Even with the introduction o
β¦ LIBER β¦
Minimizing Makespan in Semiresumable Case of Single-Machine Scheduling with an Availability Constraint
β Scribed by Ma Ying; Yang Shan-lin; Chu Cheng-bin
- Publisher
- Elsevier
- Year
- 2009
- Weight
- 198 KB
- Volume
- 29
- Category
- Article
- ISSN
- 1874-8651
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Scheduling linear deteriorating jobs to
β
Chin-Chia Wu; Wen-Chiung Lee
π
Article
π
2003
π
Elsevier Science
π
English
β 74 KB
Scheduling resumable simple linear deter
β
Min Ji; T.C.E. Cheng
π
Article
π
2010
π
Elsevier Science
π
English
β 194 KB
## a b s t r a c t We consider a single-machine scheduling problem in which the processing time of each job is a simple linear deteriorating function of its waiting time. The machine is subject to an availability constraint. Jobs interrupted by machine unavailability can resume their processing. Th
Minimizing the makespan in the non-preem
β
Yazid Mati
π
Article
π
2010
π
Elsevier Science
π
English
β 272 KB
Minimum number of tardy jobs in single m
Minimum number of tardy jobs in single machine scheduling with release datesβan improved algorithm
β
Thuruthickara C. John; Yih-Bor Wu
π
Article
π
1987
π
Elsevier Science
π
English
β 352 KB