𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Flameproof pump for hazardous and volatile areas


Publisher
Elsevier Science
Year
1997
Tongue
English
Weight
99 KB
Volume
1997
Category
Article
ISSN
0262-1762

No coin nor oath required. For personal study only.

✦ Synopsis


Waste w a t e r p u m p for the b u i l d i n g services

KSB Aktiengesellschaft in Frankental (Germany) is launching a new cast iron p u m p for all kinds of waste water. Thanks to a large free passage the p u m p copes well with coarse impurities, long-fibre substances and air bubbles in the medium.

Free passage cross-sections of 41 or 60 mm, d e p e n d i n g on t h e p u m p size, a n d a nonclogging impeller ensure reliable p u m p o p e r a t i o n even under heavy-duty conditions. The m a x i m u m capacity is 40 mS/h, a n d the m a x i m u m d i s c h a r g e head is 16 m.

Coupled to a large-sized 230 V single-phase or 400 V threep h a s e current m o t o r with winding protection, the A m a -P o r t e r is d e s i g n e d f o r y e a r s o f m a i n t e n a n c e -f r e e o p e r a t i o n . Portable or stationary versions are a v a i l a b l e on option. All wetted bolts are m a d e of stainless steel, which m e a n s t h a t the p u m p can be d i s m a n t l e d witho u t a n y p r o b l e m even a f t e r years of s u b m e r g e d operation. The cable gland meets the s t a n d a r d s a p p l i e d to KSB's large waste w a t e r pumps. The KSB's Ama®-Porter waste water pump for building services. Gilbert Gilkes & Gordon's Turbo Pump is suitable for emergency situations. individual conductors are separately insulated, tin-coated and e m b e d d e d in synthetic resin. This ensures absolutely watertight cable entry.

D e s p i t e i t s p r o f e s s i o n a l , h e a v y -d u t y design t h e p u m p was specially developed for the building services sector and is a good choice for private users looking for high quality.


📜 SIMILAR VOLUMES


Seismic hazard assessments for two test
✍ Vladimír Schenk; Zdeňka Schenková; František Mantlík; Pavel Kottnauer 📂 Article 📅 1989 🏛 Springer Netherlands 🌐 English ⚖ 976 KB

Within the activity of the ESC Subcommission 8 'Engineering Seismology', Project TERESA, seismic hazard calculations have been performed for two areas of a different earthquake activity. Fundamental seismological data (earthquake catalogues, macroseismic observations and maps) and some additional ge