The quay crane scheduling problem consists of scheduling tasks for loading and unloading containers on cranes that are assigned to a vessel for its service. This article introduces a new approach for quay crane scheduling, where the availability of cranes at a vessel is restricted to certain time wi
In the single-vehicle scheduling problem with time window constraints, a vehicle has to visit a set of sites on a graph, and each site must be visited after its ready time but no later than its deadline. The goal is to minimize the total time taken to visit all sites. We prove the conjecture propose