Scheduling with earliest start and due date constraints
โ Scribed by Paul Bratley; Michael Florian; Pierre Robillard
- Publisher
- John Wiley and Sons
- Year
- 1971
- Tongue
- English
- Weight
- 454 KB
- Volume
- 18
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
A single machine sequencing problem is considered in which there are ready-time and due-date constraints on jobs and vacation constraints on the machine. Each vacation has fixed starting and finish time and no preemption is allowed for the jobs. The objective is to minimize maximum lateness. An intr
This paper examines heuristic solution procedures for scheduling jobs on a single machine to minimize the maximum lateness in the presence of setup times between different job families. It reviews the state of knowledge about the solution of this problem, which is known to be difficult to solve in g