๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Single-vehicle scheduling with time window constraints

โœ Scribed by Gilbert H. Young; Chi-Lok Chan


Publisher
Springer US
Year
1999
Tongue
English
Weight
164 KB
Volume
2
Category
Article
ISSN
1094-6136

No coin nor oath required. For personal study only.

โœฆ Synopsis


In the single-vehicle scheduling problem with time window constraints, a vehicle has to visit a set of sites on a graph, and each site must be visited after its ready time but no later than its deadline. The goal is to minimize the total time taken to visit all sites. We prove the conjecture proposed by Psaraftis et al.: if the topological graph is a straight line, the problems are NP-hard for both part and tour version. In addition, we give an O(n) algorithm to solve a special case where all n sites have a common ready time. This algorithm illustrates a duality relationship between the vehicle scheduling problems with arbitrary ready times and that with arbitrary deadlines on a straight line.


๐Ÿ“œ SIMILAR VOLUMES


The quay crane scheduling problem with t
โœ Frank Meisel ๐Ÿ“‚ Article ๐Ÿ“… 2011 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 500 KB

The quay crane scheduling problem consists of scheduling tasks for loading and unloading containers on cranes that are assigned to a vessel for its service. This article introduces a new approach for quay crane scheduling, where the availability of cranes at a vessel is restricted to certain time wi