Consider a number of jobs to be processed on a number of identical machines in parallel. A job has a processing time, a weight and a due date. If a job is followed by another job, a setup time independent of the machine is incurred. A three phase heuristic is presented for minimizing the sum of the
β¦ LIBER β¦
ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times
β Scribed by Lin, Shih-Wei; Ying, Kuo-Ching
- Book ID
- 124127699
- Publisher
- Elsevier Science
- Year
- 2014
- Tongue
- English
- Weight
- 609 KB
- Volume
- 51
- Category
- Article
- ISSN
- 0305-0548
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Scheduling jobs on parallel machines wit
β
Young Hoon Lee; Michael Pinedo
π
Article
π
1997
π
Elsevier Science
π
English
β 855 KB
Scheduling unrelated parallel machines w
β
RubΓ©n Ruiz; Carlos AndrΓ©s-Romano
π
Article
π
2011
π
Springer
π
English
β 468 KB
Hybrid metaheuristics for unrelated para
β
Chun-Lung Chen; Chuen-Lung Chen
π
Article
π
2008
π
Springer
π
English
β 172 KB
Scheduling jobs on dynamic parallel mach
β
Zne-Jung Lee; Shih-Wei Lin; Kuo-Ching Ying
π
Article
π
2009
π
Springer
π
English
β 190 KB
Scheduling on unrelated parallel machine
β
Jeng-Fung Chen
π
Article
π
2009
π
Springer
π
English
β 207 KB
Some unrelated parallel machine scheduli
β
Wen-Hung Kuo; Chou-Jung Hsu; Dar-Li Yang
π
Article
π
2011
π
Elsevier Science
π
English
β 205 KB
Total absolute deviation of job completion times Total load a b s t r a c t In this paper, we study an unrelated parallel machine scheduling problem with setup time and learning effects simultaneously. The setup time is proportional to the length of the already processed jobs. That is, the setup ti