𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times

✍ Scribed by Rubén Ruiz; Carlos Andrés-Romano


Publisher
Springer
Year
2011
Tongue
English
Weight
468 KB
Volume
57
Category
Article
ISSN
0268-3768

No coin nor oath required. For personal study only.


📜 SIMILAR VOLUMES


Scheduling jobs on parallel machines wit
✍ Young Hoon Lee; Michael Pinedo 📂 Article 📅 1997 🏛 Elsevier Science 🌐 English ⚖ 855 KB

Consider a number of jobs to be processed on a number of identical machines in parallel. A job has a processing time, a weight and a due date. If a job is followed by another job, a setup time independent of the machine is incurred. A three phase heuristic is presented for minimizing the sum of the

Some unrelated parallel machine scheduli
✍ Wen-Hung Kuo; Chou-Jung Hsu; Dar-Li Yang 📂 Article 📅 2011 🏛 Elsevier Science 🌐 English ⚖ 205 KB

Total absolute deviation of job completion times Total load a b s t r a c t In this paper, we study an unrelated parallel machine scheduling problem with setup time and learning effects simultaneously. The setup time is proportional to the length of the already processed jobs. That is, the setup ti