Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times
✍ Scribed by Rubén Ruiz; Carlos Andrés-Romano
- Publisher
- Springer
- Year
- 2011
- Tongue
- English
- Weight
- 468 KB
- Volume
- 57
- Category
- Article
- ISSN
- 0268-3768
No coin nor oath required. For personal study only.
📜 SIMILAR VOLUMES
Consider a number of jobs to be processed on a number of identical machines in parallel. A job has a processing time, a weight and a due date. If a job is followed by another job, a setup time independent of the machine is incurred. A three phase heuristic is presented for minimizing the sum of the
Total absolute deviation of job completion times Total load a b s t r a c t In this paper, we study an unrelated parallel machine scheduling problem with setup time and learning effects simultaneously. The setup time is proportional to the length of the already processed jobs. That is, the setup ti