๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A study of heuristics for bidirectional multi-hoist production scheduling systems

โœ Scribed by T.C. Sun; K.K. Lai; Kokin Lam; K.P. So


Publisher
Elsevier Science
Year
1994
Tongue
English
Weight
675 KB
Volume
33
Category
Article
ISSN
0925-5273

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A compact heuristic for common cycle lot
โœ M.K. El-Najdawi ๐Ÿ“‚ Article ๐Ÿ“… 1992 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 1018 KB

Common Cycle Scheduling Problem (CCSP) is concerned with determining production lot sizes for a given set of products using a common facility. It is based on scheduling all products using a common (base) cycle time, so that the lot size for each product is the forecasted demand for that product over

Scheduling production for a sawmill: A c
โœ Sergio Maturana; Enzo Pizani; Jorge Vera ๐Ÿ“‚ Article ๐Ÿ“… 2010 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 421 KB

a b s t r a c t Sawmill production scheduling is complex. It involves determining which logs to process taking into account the diameter, length, and grade of each log, on one hand, and the finished products that are needed to fulfill the orders, on the other. The cutting pattern determines which pr