๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A new heuristic for scheduling the two-stage flowshop with additional resources

โœ Scribed by Ewa Figielska


Book ID
108094691
Publisher
Elsevier Science
Year
2008
Tongue
English
Weight
205 KB
Volume
54
Category
Article
ISSN
0360-8352

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Heuristic algorithms for preemptive sche
โœ Ewa Figielska ๐Ÿ“‚ Article ๐Ÿ“… 2010 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 464 KB

This paper deals with the problem of preemptive scheduling in a two-stage flowshop with parallel unrelated machines and renewable resources at both the stages. The resource requirements are of a 0-1 type. The objective is the minimization of makespan. The problem is NP-hard. Four heuristic algorithm