๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A new heuristic for project scheduling with a single resource constraint

โœ Scribed by M. Khattab; F. Choobineh


Publisher
Elsevier Science
Year
1990
Tongue
English
Weight
318 KB
Volume
19
Category
Article
ISSN
0360-8352

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A new heuristic solution method in resou
โœ Colin E. Bell; Jaemin Han ๐Ÿ“‚ Article ๐Ÿ“… 1991 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 979 KB

A new heuristic method is presented for the resolution of multiresource constrained conflicts in project scheduling. In attempting to find a minimal makespan solution, the algorithm employs a simple procedure to generate a feasible solution with no backtracking. A postanalysis phase then applies a h