๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stage

โœ Scribed by J-S. Kim; S-H. Kang; S.M. Lee


Book ID
114230883
Publisher
Elsevier Science
Year
1997
Tongue
English
Weight
648 KB
Volume
25
Category
Article
ISSN
0305-0483

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Heuristic algorithms for preemptive sche
โœ Ewa Figielska ๐Ÿ“‚ Article ๐Ÿ“… 2010 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 464 KB

This paper deals with the problem of preemptive scheduling in a two-stage flowshop with parallel unrelated machines and renewable resources at both the stages. The resource requirements are of a 0-1 type. The objective is the minimization of makespan. The problem is NP-hard. Four heuristic algorithm