This paper discusses the cost-effectiveness of utilizing the B.C. process as a pretreatment to a demineraliser installed in a cogeneration plant. The regeneration cycle time of a demineraliser was extended from approximately 9 hours to almost 336 hours resulting in a substantial savings of the chemi
Utilization of plant operating experience in new plant designs: A consultant's viewpoint
β Scribed by Michael A. Lintner; Roger W. Griebe
- Book ID
- 107953463
- Publisher
- Elsevier Science
- Year
- 1977
- Tongue
- English
- Weight
- 352 KB
- Volume
- 4
- Category
- Article
- ISSN
- 0306-4549
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
## Abstract We've all heard of Murphy's Law. It has been stated in various forms, generally something like βIf something can go wrong, it will go wrong, and at the worst possible time.β We often quote Murphy's Law often in a lightβhearted or joking context. But, do we really believe it? What effect
This study investigated the pyrolysis of automobile shredder residue (ASR) using a laboratory scale screw kiln reactor with a feed rate of about 100 g h ', Pyrolysis at temperatures between 500 and 750" resulted in the production of gas, liquid and solid fractions with hydrocarbon yields of the orga