𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Two-machine flow shop no-wait scheduling with a nonavailability interval

✍ Scribed by Mikhail A. Kubzin; Vitaly A. Strusevich


Publisher
John Wiley and Sons
Year
2004
Tongue
English
Weight
154 KB
Volume
51
Category
Article
ISSN
0894-069X

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


An FPTAS for scheduling a two-machine fl
✍ C.T. Ng; Mikhail Y. Kovalyov πŸ“‚ Article πŸ“… 2004 πŸ› John Wiley and Sons 🌐 English βš– 87 KB

## Abstract We study a deterministic two‐machine flowshop scheduling problem with an assumption that one of the two machines is not available in a specified time period. This period can be due to a breakdown, preventive maintenance, or processing unfinished jobs from a previous planning horizon. Th