๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A heuristic for the two-machine no-wait openshop scheduling problem

โœ Scribed by Jeffrey B. Sidney; Chelliah Sriskandarajah


Publisher
John Wiley and Sons
Year
1999
Tongue
English
Weight
176 KB
Volume
46
Category
Article
ISSN
0894-069X

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Makespan minimization in the two-machine
โœ T.C.E. Cheng; B.M.T. Lin; A. Toker ๐Ÿ“‚ Article ๐Ÿ“… 2000 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 202 KB ๐Ÿ‘ 1 views

In this paper we consider a practical scheduling problem commonly arising from batch production in a flexible manufacturing environment. Different part-types are to be produced in a flexible manufacturing cell organized into a two-stage production line. The jobs are processed in batches on the first

An exact algorithm for the batch sequenc
โœ A. Agnetis; F. Rossi; G. Gristina ๐Ÿ“‚ Article ๐Ÿ“… 1998 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 295 KB ๐Ÿ‘ 2 views

This paper deals with the problem of makespan minimization in a flow shop with two machines when the input buffer of the second machine can only host a limited number of parts. Here we analyze the problem in the context of batch processing, i.e., when identical parts must be processed consecutively.