In this paper we consider a practical scheduling problem commonly arising from batch production in a flexible manufacturing environment. Different part-types are to be produced in a flexible manufacturing cell organized into a two-stage production line. The jobs are processed in batches on the first
โฆ LIBER โฆ
A heuristic for the two-machine no-wait openshop scheduling problem
โ Scribed by Jeffrey B. Sidney; Chelliah Sriskandarajah
- Publisher
- John Wiley and Sons
- Year
- 1999
- Tongue
- English
- Weight
- 176 KB
- Volume
- 46
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Makespan minimization in the two-machine
โ
T.C.E. Cheng; B.M.T. Lin; A. Toker
๐
Article
๐
2000
๐
John Wiley and Sons
๐
English
โ 202 KB
๐ 1 views
An exact algorithm for the batch sequenc
โ
A. Agnetis; F. Rossi; G. Gristina
๐
Article
๐
1998
๐
John Wiley and Sons
๐
English
โ 295 KB
๐ 2 views
This paper deals with the problem of makespan minimization in a flow shop with two machines when the input buffer of the second machine can only host a limited number of parts. Here we analyze the problem in the context of batch processing, i.e., when identical parts must be processed consecutively.