𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Towards an end-to-end delay analysis of wireless multihop networks

✍ Scribed by Min Xie; Martin Haenggi


Publisher
Elsevier Science
Year
2009
Tongue
English
Weight
391 KB
Volume
7
Category
Article
ISSN
1570-8705

No coin nor oath required. For personal study only.

✦ Synopsis


In wireless multihop networks, end-to-end (e2e) delay is a critical parameter for quality of service (QoS) guarantees. We employ discrete-time queueing theory to analyze the end-toend (e2e) delay of wireless multihop networks for two MAC schemes, m-phase TDMA and slotted ALOHA. In one-dimensional (1-D) networks, due to the lack of sufficient multiplexing and splitting, a space-time correlation structure exists, the nodes are spatially correlated with each other, and the e2e performance cannot be analyzed as in general two-dimensional networks by assuming all nodes independent of each other. This paper studies an 1-D network fed with a single flow, an extreme scenario in which there is no multiplexing and splitting. A decomposition approach is used to decouple the whole network into isolated nodes. Each node is modeled as a GI/Geo/1 queueing system. First, we derive the complete per-node delay distribution and departure characterization, accounting for both the queueing delay and access delay. Second, based on the departure process approximation, we define a parameter to measure the spatial correlation and its influence on the e2e delay variance. Our study shows that traffic burstiness of the source flow and MAC together determines the sign of the correlation.


πŸ“œ SIMILAR VOLUMES


Queuing network models for delay analysi
✍ Nabhendra Bisnik; Alhussein A. Abouzeid πŸ“‚ Article πŸ“… 2009 πŸ› Elsevier Science 🌐 English βš– 384 KB

In this paper we analyze the average end-to-end delay and maximum achievable per-node throughput in random access multihop wireless ad hoc networks with stationary nodes. We present an analytical model that takes into account the number of nodes, the random packet arrival process, the extent of loca