๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Queuing network models for delay analysis of multihop wireless ad hoc networks

โœ Scribed by Nabhendra Bisnik; Alhussein A. Abouzeid


Publisher
Elsevier Science
Year
2009
Tongue
English
Weight
384 KB
Volume
7
Category
Article
ISSN
1570-8705

No coin nor oath required. For personal study only.

โœฆ Synopsis


In this paper we analyze the average end-to-end delay and maximum achievable per-node throughput in random access multihop wireless ad hoc networks with stationary nodes. We present an analytical model that takes into account the number of nodes, the random packet arrival process, the extent of locality of traffic, and the back off and collision avoidance mechanisms of random access MAC. We model random access multihop wireless networks as open G/G/1 queuing networks and use the diffusion approximation in order to evaluate closed form expressions for the average end-to-end delay. The mean service time of nodes is evaluated and used to obtain the maximum achievable per-node throughput. The analytical results obtained here from the queuing network analysis are discussed with regard to similarities and differences from the well established information-theoretic results on throughput and delay scaling laws in ad hoc networks. We also investigate the extent of deviation of delay and throughput in a real world network from the analytical results presented in this paper. We conduct extensive simulations in order to verify the analytical results and also compare them against NS-2 simulations.


๐Ÿ“œ SIMILAR VOLUMES


Towards an end-to-end delay analysis of
โœ Min Xie; Martin Haenggi ๐Ÿ“‚ Article ๐Ÿ“… 2009 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 391 KB

In wireless multihop networks, end-to-end (e2e) delay is a critical parameter for quality of service (QoS) guarantees. We employ discrete-time queueing theory to analyze the end-toend (e2e) delay of wireless multihop networks for two MAC schemes, m-phase TDMA and slotted ALOHA. In one-dimensional (1

Design of multichannel MAC protocols for
โœ Shou-Chih Lo ๐Ÿ“‚ Article ๐Ÿ“… 2009 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 272 KB

## Abstract Medium access control (MAC) protocols coordinate channel access between wireless stations, and they significantly affect the network throughput of wireless ad hoc networks. MAC protocols that are based on a multichannel model can increase the throughput by enabling more simultaneous tra