𝔖 Bobbio Scriptorium
✦   LIBER   ✦

The split delivery vehicle scheduling problem with time windows and grid network distances

✍ Scribed by P.W. Frizzell; J.W. Giffin


Publisher
Elsevier Science
Year
1995
Tongue
English
Weight
907 KB
Volume
22
Category
Article
ISSN
0305-0548

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


The quay crane scheduling problem with t
✍ Frank Meisel πŸ“‚ Article πŸ“… 2011 πŸ› John Wiley and Sons 🌐 English βš– 500 KB

The quay crane scheduling problem consists of scheduling tasks for loading and unloading containers on cranes that are assigned to a vessel for its service. This article introduces a new approach for quay crane scheduling, where the availability of cranes at a vessel is restricted to certain time wi

A branch-and-price-based large neighborh
✍ Eric Prescott-Gagnon; Guy Desaulniers; Louis-Martin Rousseau πŸ“‚ Article πŸ“… 2009 πŸ› John Wiley and Sons 🌐 English βš– 153 KB

## Abstract Given a fleet of vehicles assigned to a single depot, the vehicle routing problem with time windows (VRPTW) consists of determining a set of feasible vehicle routes to deliver goods to a set of customers while minimizing, first, the number of vehicles used and, second, total distance tr