The quay crane scheduling problem consists of scheduling tasks for loading and unloading containers on cranes that are assigned to a vessel for its service. This article introduces a new approach for quay crane scheduling, where the availability of cranes at a vessel is restricted to certain time wi
โฆ LIBER โฆ
The selection and scheduling of telecommunication calls with time windows
โ Scribed by Ali Amiri
- Book ID
- 108116796
- Publisher
- Elsevier Science
- Year
- 2005
- Tongue
- English
- Weight
- 302 KB
- Volume
- 167
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
The quay crane scheduling problem with t
โ
Frank Meisel
๐
Article
๐
2011
๐
John Wiley and Sons
๐
English
โ 500 KB
The split delivery vehicle scheduling pr
โ
P.W. Frizzell; J.W. Giffin
๐
Article
๐
1995
๐
Elsevier Science
๐
English
โ 907 KB
Maximizing the weighted number of on-tim
โ
C. Koulamas
๐
Article
๐
1997
๐
Elsevier Science
๐
English
โ 541 KB
The problem of maximizing the weighted number of on-time jobs on a single machine with time windows (STW) is shown to be strongly NP-hard. An efficient. heuristic is presented for STW. Computational experiments indicate that the performance of the heuristic is quite good.
Algorithms for the Vehicle Routing and S
โ
Solomon, Marius M.
๐
Article
๐
1987
๐
INFORMS
๐
English
โ 669 KB
A parallel route building algorithm for
A parallel route building algorithm for the vehicle routing and scheduling problem with time windows
โ
Jean-Yves Potvin; Jean-Marc Rousseau
๐
Article
๐
1993
๐
Elsevier Science
๐
English
โ 675 KB
The selection and scheduling of textile
โ
Helman I. Stern; Zion Avivi
๐
Article
๐
1990
๐
Elsevier Science
๐
English
โ 439 KB