𝔖 Scriptorium
✦   LIBER   ✦

📁

The JCT Design and Build Contract 2005

✍ Scribed by David Chappell


Publisher
Wiley-Blackwell
Year
2007
Tongue
English
Leaves
290
Edition
3
Category
Library

⬇  Acquire This Volume

No coin nor oath required. For personal study only.

✦ Synopsis


The Joint Contracts Tribunal issued a new Design and Build Form in 2005, a successor to the JCT Standard Form of Building Contract with Contractor’s Design. It looks substantially different from its predecessor and it is different in structure and often in its wording.This major new edition of David Chappell’s well regarded book has been substantially revised to take account of the new contract terms and different structure. It also considers:the latest RIBA Terms of Engagementthe standard novation agreements from the CIC and City of London Law SocietyMore than 70 additional casesIt discusses areas where problems frequently arise:the allocation of design responsibilitydiscrepanciesthe role of the employer’s agentpayment provisionsthe approval of drawingsThe book will be useful for contractors, for professionals acting as employer’s agent, whether architect, engineer or surveyor, and for the design team acting for the contractor. It will also be of interest to employers embarking on design and build for the first time and to lawyers.From reviews of the last edition:"an authoritative guide to case law [this book] is also unafraid of controversy… it remains an enjoyable and essential read for professionals and lawyers involved in design and build" –Building"David Chappell’s knowledge of his subject is encyclopaedic, but allied to an ability to explain difficult questions in an accessible format." –Construction LawThe AuthorDavid Chappell BA(HonsArch), MA (Arch), MA (Law), PhD, RIBA has 45 years’ experience in the construction industry, having worked as an architect in the public and private sectors, as contracts administrator for a building contractor, as a lecturer in construction law and contract procedures and, for the last twenty years, as a construction contract consultant . He is currently the Director of David Chappell Consultancy Limited and frequently acts as an adjudicator. He was Professor and Senior Research Fellow in Architectural Practice and Management Research at The Queen’s University Belfast and Visiting Professor of Practice Management and Law at the University of Central England in Birmingham. David Chappell is the author of many articles and books for the construction industry. He is one of the RIBA Specialist Advisors and lectures widely.Also of interestThe JCT Intermediate Building Contracts,Third Edition, David Chappell,     1405140496, 9781405140492The JCT Minor Works Building Contracts 2005, Fourth Edition, David Chappell, 1405152710, 97814051 5271 6The JCT 05 Standard Building Sub-contract, Peter Barnes, 1405140488,9781405140485The Law & Management of Building Subcontracts, Second Edition, John McGuinness, 1405161027, 9781405161022The NEC 3 Engineering and Construction Contract, Second Edition, Brian Eggleston, 0632053860, 9780632053865One Hundred and Fifty Contractual Problems and their Solutions, Second Edition, Roger Knowles

✦ Table of Contents


The JCT Design and Build Contract 2005......Page 5
Contents......Page 7
Preface to the Third Edition......Page 11
1.1 Definitions......Page 13
1.2 Advantages and disadvantages......Page 16
1.3 The architect's role......Page 17
1.4 Standard forms available......Page 19
1.5 Tendering procedures......Page 29
2.1 The documents......Page 34
2.2 Completing the form......Page 35
2.3 Employer's Requirements......Page 43
2.4 Contractor's Proposals......Page 47
2.6 Supplementary provisions......Page 48
2.7 Priority, discrepancies, errors......Page 49
2.9 Notices......Page 53
3.1 General principles of design liability......Page 56
3.2 Liability under the contract......Page 63
3.3 Design liability optional arrangements and consequences......Page 69
3.4 Consultant switch and novation......Page 75
3.5 Novation agreements......Page 78
3.7 Consultant warranties......Page 80
4.2 Implied terms......Page 82
4.3 Express terms......Page 83
4.4 Other obligations......Page 107
5.1 Employer's agent......Page 110
5.2 Express and implied terms......Page 112
5.3 Instructions......Page 125
5.4 Powers......Page 133
5.5 Employer's duties......Page 137
6.1 General......Page 141
6.2 Sub-contractors......Page 142
6.3 Statutory requirements......Page 146
6.4 The Construction (Design and Management) Regulations 2007......Page 150
6.5 Work not forming part of the contract......Page 151
6.6 Third party rights and collateral warranties......Page 152
7.1 Possession and deferment......Page 156
7.2 Progress......Page 157
7.3 Practical completion......Page 159
7.4 Partial possession......Page 161
7.5 Rectification period......Page 162
8.1 Principles......Page 165
8.2 Contract procedure......Page 167
8.3 Relevant events......Page 170
8.4 Liquidated damages......Page 174
9.1 Types of claim......Page 179
9.2 Application for direct loss and/or expense......Page 180
9.3 Supplemental provision procedures (para. 5)......Page 185
9.4 Grounds for direct loss and/or expense......Page 186
9.5 Antiquities......Page 189
10.1 Contract sum......Page 190
10.2 Interim payments......Page 192
10.3 Applications......Page 197
10.4 Employer's right to withhold payment or to deduct......Page 201
10.5 Retention......Page 202
10.6 Final payment......Page 204
10.8 Changes......Page 210
10.9 Valuation of changes under the supplemental provisions......Page 213
10.10 Fluctuations......Page 215
10.11 VAT......Page 217
11.1 Injury to persons and property......Page 218
11.2 Employer's liability......Page 219
11.3 Insurance of the Works......Page 221
11.4 Insurance of the Works: new building......Page 222
11.5 Insurance of the Works: existing building......Page 224
11.7 The Joint Fire Code......Page 226
11.8 Professional indemnity insurance......Page 227
12.1 Common law position......Page 229
12.2 Termination generally......Page 230
12.3 Termination by the employer......Page 232
12.4 Termination by the contractor......Page 239
13.1 General......Page 245
13.2 Adjudication......Page 249
13.3 Arbitration......Page 259
13.4 Legal proceedings......Page 267
Table of Cases......Page 268
Clause Index......Page 277
Subject Index......Page 285


📜 SIMILAR VOLUMES


The JCT Design and Build Contract 2005,
✍ David Chappell(auth.) 📂 Library 📅 2007 🏛 Wiley-Blackwell 🌐 English

The Joint Contracts Tribunal issued a new Design and Build Form in 2005, a successor to the JCT Standard Form of Building Contract with Contractor’s Design. It looks substantially different from its predecessor and it is different in structure and often in its wording.<br><p> This major new edition

The JCT Intermediate Building Contracts:
✍ David Chappell 📂 Library 📅 2006 🏛 Wiley-Blackwell 🌐 English

Chappell: The JCT Intermediate Building Contracts 2005 - Front Jacket FlapThis book provides a practical tool for all those using the suite of JCT Intermediate Building Contracts. It deals with the form under topics, considering the roles of the various parties and important matters such as payments

Guide to JCT Design and Build Contract 2
✍ Sarah Lupton (Author) 📂 Library 📅 2019 🏛 RIBA Publishing

<p><em>Guide to JCT Design and Build Contract 2016</em>, the new edition of the author`s ever popular Guide to DB11, is a practical guide to the operation and administration of the JCT Design & Build Building Contract suite 2016. All of the contract`s provisions, procedures and conditions are organi

The JCT Minor Works Building Contracts 2
✍ David Chappell 📂 Library 📅 2006 🏛 Wiley-Blackwell 🌐 English

The Minor Works Contract is the most widely used of the JCT forms of contract, not only for simple, short contracts of moderate price, for which it is intended, but also for much larger projects for which it is often not suited at all. As a result, contractual difficulties can arise, and despite the

The JCT Minor Works Building Contracts 2
✍ David Chappell 📂 Library 📅 2006 🏛 Wiley-Blackwell 🌐 English

The Minor Works Contract is the most widely used of the JCT forms of contract, not only for simple, short contracts of moderate price, for which it is intended, but also for much larger projects for which it is often not suited at all. As a result, contractual difficulties can arise, and despite the