<p><i><p><p>Guide to JCT Standard Building Contract 2016 </i>is a practical guide to the operation and administration of JCTβs SBC 2016 suite of building contracts (SBC/Q, SBC/AQ and SBC/XQ). All of the contractsβ provisions, procedures and conditions are organised and explained by subject, clearly
Guide to JCT Design and Build Contract 2016
β Scribed by Sarah Lupton (Author)
- Publisher
- RIBA Publishing
- Year
- 2019
- Leaves
- 169
- Edition
- 1
- Category
- Library
No coin nor oath required. For personal study only.
β¦ Synopsis
Guide to JCT Design and Build Contract 2016, the new edition of the author`s ever popular Guide to DB11, is a practical guide to the operation and administration of the JCT Design & Build Building Contract suite 2016. All of the contract`s provisions, procedures and conditions are organised and explained by subject, clearly distinguishing the different obligations due to various parties and the contractual issues arising during the course of a job - all backed up by the latest legislation and case law.
Not only is this an indispensable reference for the hard-pressed practitioner, but, assuming no prior knowledge of JCT contracts or the law, it is also ideal for architecture and other construction students on the threshold of undertaking their professional exams.
β¦ Table of Contents
1. About MW16 2. Documents 3. Obligations of the Contractor 4. Possession and Completion 5. Control of the Works 6. Sums Properly Due 7. Payment 8. Indemnity and Insurance 9. Default and Termination 10. Dispute Resolution
β¦ Subjects
Built Environment;Architecture;Professional Practice
π SIMILAR VOLUMES
<p><i><p><p>Guide to JCT Intermediate Building Contract 2016 </i>is a practical guide to the operation and administration of JCTs IC16 suite of building contracts including both IC and ICD. All of the contracts provisions, procedures and conditions are organised and explained by subject, clearly dis
<p><em>Guide to JCT Minor Works</em> is a practical guide to the operation and administration of the JCT Minor Works Building Contract suite 2016. All of the contractsβ provisions, procedures and conditions are organised and explained by subject, clearly distinguishing the different obligations due
The Joint Contracts Tribunal issued a new Design and Build Form in 2005, a successor to the JCT Standard Form of Building Contract with Contractorβs Design. It looks substantially different from its predecessor and it is different in structure and often in its wording.This major new edition of David
The Joint Contracts Tribunal issued a new Design and Build Form in 2005, a successor to the JCT Standard Form of Building Contract with Contractorβs Design. It looks substantially different from its predecessor and it is different in structure and often in its wording.<br><p> This major new edition