๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

The flow shop problem with time lags and separated setup times

โœ Scribed by Wlodzimierz Szwarc


Publisher
Springer
Year
1986
Tongue
English
Weight
298 KB
Volume
30
Category
Article
ISSN
0340-9422

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Flow shop scheduling with multiple opera
โœ J. Riezebos; G. J. C. Gaalman; J. N. D. Gupta ๐Ÿ“‚ Article ๐Ÿ“… 1995 ๐Ÿ› Springer US ๐ŸŒ English โš– 996 KB

A scheduling system is proposed and developed for a special type of flow shop. In this flow shop there is one machine at each stage. A job may require multiple operations at each stage. The first operation of a job on stage j cannot start until the last operation of the job on stage j -1 has finishe

Asymptotically optimal schedules for sin
โœ S.M.R. Iravani; C.P. Teo ๐Ÿ“‚ Article ๐Ÿ“… 2005 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 221 KB

We consider the processing of M jobs in a flow shop with N stations in which only a single server is in charge of all stations. We demonstrate that for the objective of minimizing the total setup and holding cost, a class of easily implementable schedules is asymptotically optimal.