Steady-state and transient delay analysis of ARQ protocols
β Scribed by ME Anagnostou; ED Sykas; EN Protonotarios
- Publisher
- Elsevier Science
- Year
- 1984
- Tongue
- English
- Weight
- 632 KB
- Volume
- 7
- Category
- Article
- ISSN
- 0140-3664
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
The main limiting factor, among others, on how long an electrical machine can be operated continuously on load remains the temperature of the various circuit elements (electrical and magnetic) that constitute the machine. On the other hand, the maximum permissible temperature of the machine parts be
In this paper we discuss different quantities that allow a characterization of steady-state and transient properties of nonequilibrium reaction-diffusion systems for which microscopic reversibility is broken. Using numerical exact techniques and numerical simulations we show that stationary probabil