Present status of the radioactive nuclea
β
H. Miyatake; S.C. Jeong; H. Ishiyama; Y. Ishida; H. Kawakami; N. Yoshikawa; I. K
π
Article
π
2002
π
Elsevier Science
π
English
β 78 KB
The performance of the RNB facility at KEK-Tanashi, which is a pilot facility for the E-arena in the KEK-JAERI joint project, is presented. The muonic X-ray spectroscopy of unstable nuclei by combining the RNB with muon-beam from the M-arena in the joint project is introduced.