𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Present status of the radioactive nuclear beam facility at KEK-Tanashi and the E-arena in the KEK–JAERI joint project

✍ Scribed by H. Miyatake; S.C. Jeong; H. Ishiyama; Y. Ishida; H. Kawakami; N. Yoshikawa; I. Katayama; M.H. Tanaka; E. Tojyo; M. Oyaizu; S. Arai; S. Tomizawa; K. Niki; Y. Arakaki; M. Okada; Y. Takeda; M. Wada; P. Strasser; S. Kubono; T. Nomura


Publisher
Elsevier Science
Year
2002
Tongue
English
Weight
78 KB
Volume
701
Category
Article
ISSN
0375-9474

No coin nor oath required. For personal study only.

✦ Synopsis


The performance of the RNB facility at KEK-Tanashi, which is a pilot facility for the E-arena in the KEK-JAERI joint project, is presented. The muonic X-ray spectroscopy of unstable nuclei by combining the RNB with muon-beam from the M-arena in the joint project is introduced.