AbstractΓWe consider the problem of scheduling n identical jobs with unequal ready times on m parallel uniform machines to minimize the maximum lateness. This paper develops a branch-and-bound procedure that optimally solves the problem and introduces six simple single-pass heuristic procedures that
β¦ LIBER β¦
Scheduling to minimize maximum lateness on unequal parallel processors
β Scribed by Prabuddha De; Thomas E. Morion
- Publisher
- Elsevier Science
- Year
- 1982
- Tongue
- English
- Weight
- 965 KB
- Volume
- 9
- Category
- Article
- ISSN
- 0305-0548
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Scheduling identical jobs with unequal r
β
Maged M. Dessouky
π
Article
π
1998
π
Elsevier Science
π
English
β 308 KB
Scheduling parallel processors to minimi
β
Robert T. Sumichrast
π
Article
π
1987
π
Elsevier Science
π
English
β 735 KB
Note: Open-shop scheduling with release
β
Hans Kellerer; Thomas Tautenhahn; Gerhard Woeginger
π
Article
π
1995
π
John Wiley and Sons
π
English
β 295 KB
π 2 views
We present the first polynomial-time algorithm for an open-shop problem with unit execution times, arbitrary release dates, and due dates. The objective is to minimize maximum lateness. 0 I995 John Wiley & Sons. Inc.
Two-machine proportionate flowshop sched
β
Ali Allahverdi
π
Article
π
1996
π
Elsevier Science
π
English
β 559 KB
A simulated annealing approach to minimi
β
Kai Li; Shan-Lin Yang; Hua-Wei Ma
π
Article
π
2011
π
Elsevier Science
π
English
β 314 KB
This paper considers the uniform parallel machine scheduling problem which is to minimize the maximum lateness. This problem is equivalent to the uniform parallel machine scheduling problem, which is to minimize the maximal completion time of n jobs whose release times are zero, processing times dep
Scheduling in n-job, m-stage flowshop wi
β
Chandrasekharan Rajendran; Dipak Chaudhuri
π
Article
π
1992
π
Elsevier Science
π
English
β 520 KB