𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Scheduling multioperation jobs on a single flexible machine

✍ Scribed by Ling-Huey Su; Yu-Hsi Chen


Publisher
Springer
Year
2008
Tongue
English
Weight
226 KB
Volume
42
Category
Article
ISSN
0268-3768

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Scheduling maintenance and semiresumable
✍ Gregory H. Graves; Chung-Yee Lee πŸ“‚ Article πŸ“… 1999 πŸ› John Wiley and Sons 🌐 English βš– 349 KB πŸ‘ 1 views

The majority of scheduling literature assumes that the machines are available at all times. In this paper, we study single machine scheduling problems where the machine maintenance must be performed within certain intervals and hence the machine is not available during the maintenance periods. We al

Scheduling grouped jobs on single machin
✍ Dingwei Wang; Mitsuo Gen; Runwwei Cheng πŸ“‚ Article πŸ“… 1999 πŸ› Elsevier Science 🌐 English βš– 176 KB

Production scheduling of grouped jobs has been an active research area since GT (Group Technology) was widely applied in practical manufacturing systems. To minimize the total Β―owtime of grouped jobs on a single machine, we combine jobs into fundamental runs based upon the necessary condition of the