The majority of scheduling literature assumes that the machines are available at all times. In this paper, we study single machine scheduling problems where the machine maintenance must be performed within certain intervals and hence the machine is not available during the maintenance periods. We al
β¦ LIBER β¦
Scheduling multioperation jobs on a single flexible machine
β Scribed by Ling-Huey Su; Yu-Hsi Chen
- Publisher
- Springer
- Year
- 2008
- Tongue
- English
- Weight
- 226 KB
- Volume
- 42
- Category
- Article
- ISSN
- 0268-3768
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Scheduling maintenance and semiresumable
β
Gregory H. Graves; Chung-Yee Lee
π
Article
π
1999
π
John Wiley and Sons
π
English
β 349 KB
π 1 views
Scheduling deteriorating jobs on a singl
β
Xiaoqiang Cai; Xianyi Wu; Xian Zhou
π
Article
π
2009
π
Springer US
π
English
β 560 KB
Scheduling stochastic jobs on a single m
β
K. D. Glazebrook
π
Article
π
1984
π
John Wiley and Sons
π
English
β 745 KB
Scheduling grouped jobs on single machin
β
Dingwei Wang; Mitsuo Gen; Runwwei Cheng
π
Article
π
1999
π
Elsevier Science
π
English
β 176 KB
Production scheduling of grouped jobs has been an active research area since GT (Group Technology) was widely applied in practical manufacturing systems. To minimize the total Β―owtime of grouped jobs on a single machine, we combine jobs into fundamental runs based upon the necessary condition of the
On single-machine scheduling with flexib
β
Dehua Xu; Yunqiang Yin
π
Article
π
2011
π
Springer
π
English
β 306 KB
Two-agent group scheduling with deterior
β
Peng Liu; Lixin Tang; Xiaoye Zhou
π
Article
π
2009
π
Springer
π
English
β 206 KB