In this paper we propose a modified genetic algorithm for the single machine scheduling problem with ready times. This algorithm improves the simple genetic algorithm by introducing two new steps: (1) a filtering step to filter out the worst solutions in each generation and fill in their positions w
Scheduling grouped jobs on single machine with genetic algorithm
β Scribed by Dingwei Wang; Mitsuo Gen; Runwwei Cheng
- Publisher
- Elsevier Science
- Year
- 1999
- Tongue
- English
- Weight
- 176 KB
- Volume
- 36
- Category
- Article
- ISSN
- 0360-8352
No coin nor oath required. For personal study only.
β¦ Synopsis
Production scheduling of grouped jobs has been an active research area since GT (Group Technology) was widely applied in practical manufacturing systems. To minimize the total Β―owtime of grouped jobs on a single machine, we combine jobs into fundamental runs based upon the necessary condition of the optimal solution. It is proved that the optimal solution is a combination of fundamental runs. A genetic algorithm is designed based on studies on the combinatorial rules of fundamental runs. The numerical results show that the computational performance of the algorithm depends on the number of `fundamental' runs, not on the number of jobs. In general, the number of fundamental runs is far less than the number of jobs. Therefore, the algorithm has potential for practical application in large scale production systems.
π SIMILAR VOLUMES
In a manufacturing system workers are involved in doing the same job or activity repeatedly. Hence, the workers start learning more about the job or activity. Because of the learning, the time to complete the job or activity starts decreasing, which is known as ''learning effect''. In this paper, an
In the paper two resource constrained single-machine group scheduling problems with both learning effects and deteriorating jobs are considered. By learning effects, deteriorating jobs and group technology assumption, we mean that the processing time of a job is defined by the function of its starti
The majority of scheduling literature assumes that the machines are available at all times. In this paper, we study single machine scheduling problems where the machine maintenance must be performed within certain intervals and hence the machine is not available during the maintenance periods. We al