Rescheduling strategies for minimizing total weighted tardiness in complex job shops
β Scribed by Mason, S. J.; Jin, S.; Wessels, C. M.
- Book ID
- 126725299
- Publisher
- Taylor and Francis Group
- Year
- 2004
- Tongue
- English
- Weight
- 529 KB
- Volume
- 42
- Category
- Article
- ISSN
- 0020-7543
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Increases in the demand for integrated circuits have highlighted the importance of meeting customer quality and on-time delivery expectations in the semiconductor industry. A modiΓΏed shifting bottleneck heuristic is developed for minimizing the total weighted tardiness in a semiconductor wafer fabri
Consider a #exible #ow shop with s stages in series and at each stage a number of identical machines in parallel. There are n jobs to be processed and each job has to go through the stages following the same route. Job j has release date r H , due date d H , weight w H and a processing time p HJ at
We consider a job shop with m machines. There are n jobs and each job has a speciΓΏed sequence to be processed by the machines. Job j has release date rj, due date dj, weight wj and processing time pij on machine i (1; : : : ; m). The objective is to minimize the total weighted tardiness of the n job