Replenishment run time problem with machine breakdown and failure in rework
β Scribed by Yuan-Shyi Peter Chiu; Kuang-Ku Chen; Chia-Kuan Ting
- Book ID
- 113607033
- Publisher
- Elsevier Science
- Year
- 2012
- Tongue
- English
- Weight
- 385 KB
- Volume
- 39
- Category
- Article
- ISSN
- 0957-4174
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
## Abstract This paper is concerned with optimization of production run time that takes stochastic breakdown and the reworking of defective items into consideration. In a realβlife manufacturing process, production of imperfect quality items as well as random breakdowns of production equipment is i
This paper employs mathematical modeling for solving manufacturing run time problem with random defective rate and stochastic machine breakdown. In real life manufacturing systems, generation of nonconforming items and unexpected breakdown of production equipment are inevitable. For the purpose of a