Note on “replenishment run time problem with machine breakdown and failure in rework”
✍ Scribed by Hong-Dar Lin; Yuan-Shyi Peter Chiu
- Book ID
- 116454181
- Publisher
- Elsevier Science
- Year
- 2012
- Tongue
- English
- Weight
- 180 KB
- Volume
- 39
- Category
- Article
- ISSN
- 0957-4174
No coin nor oath required. For personal study only.
📜 SIMILAR VOLUMES
This paper employs mathematical modeling for solving manufacturing run time problem with random defective rate and stochastic machine breakdown. In real life manufacturing systems, generation of nonconforming items and unexpected breakdown of production equipment are inevitable. For the purpose of a
This paper analyzes the Smith-heuristic for the single-machine scheduling problem where the objective is to minimize the total weighted completion time subject to the constraint that the tardiness for any job does not exceed a prespecified maximum allowable tardiness. We identify several cases of th
## Abstract The aim of this article is to point out some flaws in the mathematical programming model proposed by Tamer Eren [Human and Machine Effects in a Just‐In‐Time Scheduling Problem, Human Factors and Ergonomics in Manufacturing, 19(4), 294–299 (2009)]. Ignoring these flaws may cause unexpect