Rebar Cage and Construction Safety: Best Practices
โ Scribed by Edited by Michael J. Casey, Girum S. Urgessa, Girum S. Urgessa, Michael J. Casey
- Publisher
- American Society of Civil Engineers
- Year
- 2012
- Tongue
- English
- Leaves
- 53
- Category
- Library
No coin nor oath required. For personal study only.
โฆ Synopsis
Rebar Cage Construction and Safety: Best Practices presents guidelines for the safe handling of steel reinforcing-bar (rebar) cages throughout the design, fabrication, and erection process. The focus is on rebar cages used for large, cast-in-place concrete columns in a variety of settings, including bridge piers, elevated highway sections, and high-rise buildings. These cages are inherently unstable, usually held together by tie-wire alone. They are challenging to fabricate, to lift from the horizontal to the vertical position, and to support in the temporary condition until concrete is cast. Engineered temporary support systems, such as bracing or cable-guy systems, can mitigate the instability of standing rebar cages and resist lateral loads, ensuring better safety for the iron workers tasked with climbing the cages. Topics include:
๐ SIMILAR VOLUMES
<p>This important new book considers health and safety management as an equal partner to other strategic business risks. Concepts of risk and models of risk management supply the context for the management of health and safety in a range of sectors. By applying the principles of business risk manage
This book is a wide-ranging exploration of PR and communication in the construction industry, with a strong emphasis on communications theory, strategy and technique. The editors begin with an introduction to the UK construction industry and its supply chains, as well as various elements of PR
<p>The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated
<p>The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated
<p>Delay and disruption in the course of construction impacts upon building projects of any scale. Now in its 5th edition <i>Delay and Disruption in Construction Contracts</i> continues to be the pre-eminent guide to these often complex and potentially costly issues and has been cited by the judicia