Part 1. Scheduling Without Resources -- The PERT/CPM Technique -- The Critical Path Method -- The VMW Project -- Schedule Risk Analysis -- The Mutum-ParanaΜ II Bridge Project (A) -- Introduction -- Part 2. Scheduling with Resources -- Resource-Constrained Project Scheduling -- Resource-Constrained
Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control
β Scribed by Mario Vanhoucke
- Publisher
- Springer
- Year
- 2013
- Tongue
- English
- Leaves
- 321
- Edition
- 2nd ed.
- Category
- Library
No coin nor oath required. For personal study only.
β¦ Synopsis
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project scheduleβs risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a projectβs baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on.
In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the projectβs time and cost reserves.
The second edition of this book has seen corrections, additionsΒ and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".
π SIMILAR VOLUMES
<p><p>The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project scheduleβs risk as preparation of the project control phase during project progress. This
<p><p>This handbook is a unique, comprehensive resource for professional project managers and students in project management courses that focuses on the integration between baseline scheduling, schedule risk analysis and project control, also known as Dynamic Scheduling or Integrated Project Managem
The Practical, Precise, and Proven Approach to Integrated Cost and Schedule Control! This trusted project management resource, now in its second edition, includes expanded coverage of how integrated cost and schedule control works within the federal government. With the renewed emphasis on transpare