𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities

✍ Scribed by Olivier Lambrechts; Erik Demeulemeester; Willy Herroelen


Publisher
Springer US
Year
2007
Tongue
English
Weight
601 KB
Volume
11
Category
Article
ISSN
1094-6136

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


A metaheuristic scheduling procedure for
✍ Dan Zhu; Rema Padman πŸ“‚ Article πŸ“… 1999 πŸ› John Wiley and Sons 🌐 English βš– 244 KB πŸ‘ 2 views

Resource-constrained project scheduling problems with cash flows (RCPSPCF) are complex, combinatorial optimization problems. Many heuristics have been reported in the literature that produce reasonable schedules in limited project environments. However, the lack of a heuristic that dominates under d

Local search techniques for the generali
✍ Scott E. Sampson; Elliott N. Weiss πŸ“‚ Article πŸ“… 1993 πŸ› John Wiley and Sons 🌐 English βš– 665 KB

In this article we address the problem of scheduling a single project network with both precedence and resource constraints through the use of a local search technique. We choose a solution definition which guarantees precedence feasibility, allowing the procedure to focus on overcoming resource inf

A branch and bound algorithm for the res
✍ Peter Brucker; Sigrid Knust; Arno Schoo; Olaf Thiele πŸ“‚ Article πŸ“… 1998 πŸ› Elsevier Science 🌐 English βš– 257 KB

A branch and bound algorithm is presented for the resource-constrained project scheduling problem (RCPSP). Given are n activities which have to be processed without preemptions. During the processing period of an activity constant amounts of renewable resources are needed where the available capacit