A branch and bound algorithm is presented for the resource-constrained project scheduling problem (RCPSP). Given are n activities which have to be processed without preemptions. During the processing period of an activity constant amounts of renewable resources are needed where the available capacit
β¦ LIBER β¦
A branch-and-bound algorithm for the resource-constrained project scheduling problem
β Scribed by U. Dorndorf; E. Pesch; T. Phan-Huy
- Publisher
- Springer
- Year
- 2000
- Tongue
- English
- Weight
- 184 KB
- Volume
- 52
- Category
- Article
- ISSN
- 0340-9422
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
A branch and bound algorithm for the res
β
Peter Brucker; Sigrid Knust; Arno Schoo; Olaf Thiele
π
Article
π
1998
π
Elsevier Science
π
English
β 257 KB
A genetic algorithm for multi-mode resou
β
Masao Mori; Ching Chih Tseng
π
Article
π
1997
π
Elsevier Science
π
English
β 540 KB
This article considers a general class of nonpreemptive multi-mode resource-constrained project scheduling problems in which activity durations depend on committed renewable resources (multi-mode time resource tradeoff). We propose a genetic algorithm for these problems and compare it with a stochas
A genetic algorithm with neighborhood se
A genetic algorithm with neighborhood search for the resource-constrained project scheduling problem
β
Sepehr Proon; Mingzhou Jin
π
Article
π
2011
π
John Wiley and Sons
π
English
β 204 KB
A competitive genetic algorithm for reso
β
SΓΆnke Hartmann
π
Article
π
1998
π
John Wiley and Sons
π
English
β 100 KB
π 2 views
Using an enhanced scatter search algorit
β
M. D. Mahdi Mobini; M. Rabbani; M. S. Amalnik; J. Razmi; A. R. Rahimi-Vahed
π
Article
π
2008
π
Springer
π
English
β 554 KB
Project scheduling with resource constra
β
Nicos Christofides; R. Alvarez-Valdes; J.M. Tamarit
π
Article
π
1987
π
Elsevier Science
π
English
β 952 KB